In manufacturing, persistent bottlenecks are often attributed to technology gaps or a shortage of labor. Yet in my experience, the true culprit is frequently hiding in plain sight: disorganization and unclear processes. That’s where structured tools like 5S and systematic Root Cause Analysis come in.

At the Manufacturing Skills Institute (MSI), our World Class Manufacturing (WCM) program equips teams with the skills to delve deeper, identify the root causes of inefficiencies, and implement practical solutions that endure.

A strong example of this is G&W Electric, which transformed a stubborn bottleneck into a model of efficiency by utilizing 5S and A3 problem-solving.

The Challenge: A Production Bottleneck Hidden in Plain Sight

At a critical juncture in G&W Electric’s manufacturing process, specifically in the PD Bushing Testing area, a persistent issue was undermining productivity. Despite ambitious targets, the team routinely fell short of their goal of 135 units per 8-hour shift. Instead of achieving the required 12 to 17 units per hour, output was stuck at 5 to 6 units per hour. The problem wasn’t lack of effort—it was hidden inefficiency stemming from chaos in the workspace.

Key Challenges

  • Quality Risks: Bushings must undergo precise Hipot and Partial Discharge (PD) testing to ensure dielectric integrity. Delays at this stage threatened final product quality.
  • Wasted Time: Technicians lost valuable time rummaging through a single cluttered drawer for the correct fixtures, often mixed with unrelated tools.
  • Unrealistic Goals: The production goal failed to account for essential tasks, such as leak tests, capacitance tests, or adding studs to specific bushings, thereby placing additional pressure on the team.
  • Shared Space Issues: Other employees occasionally used the same workbench for unrelated tasks, adding to the disorder.

The MSI Approach: World Class Manufacturing & A3 Problem Solving

These problems are common in manufacturing—and they’re exactly why MSI developed the World Class Manufacturing program. WCM is designed for individuals who are natural leaders, practical thinkers, and invested in their organization’s success.

Key Learnings

  • Implement continuous improvement techniques to enhance productivity and reduce waste.
  • Conduct Gemba Kaizen events to observe processes and uncover hidden problems.
  • Develop and standardize Lean methods throughout the facility to achieve sustained improvement.
  • Apply root cause analysis tools, such as the Five Whys, Fishbone Diagrams, and Cause-and-Effect analysis, to systematically identify problems.
  • Utilize A3 sheets to document project results and address root causes scientifically.

G&W Electric’s Root Cause Analysis & 5S Journey

As part of their WCM training, G&W Electric selected the PD Bushing Testing bottleneck as a live improvement project. They began with a Gemba walk—observing the actual work happening on the floor—and followed with structured Root Cause Analysis to dig deeper.

A3 Report Findings

  • Low Cycle Times — WHY? Unrealistic goals combined with inefficient workflows.
  • Inefficient Workflows — WHY? Technicians constantly searched for fixtures and switched between tasks.
  • Searching for Fixtures — WHY? Not every fixture fits every bushing, and all fixtures were mixed together in one crowded drawer.
  • Disorganization — WHY? There was no universal fixture system and a complete absence of 5S practices at the workstation.
  • Lack of 5S — WHY? A systemic issue in managing the workspace environment.

The Solution: Implementing 6S for Order, Safety, & Efficiency

Armed with root cause insights, the team launched a targeted 6S transformation to tackle the problem at its roots. Initially, the team focused on classic 5S principles. But through their analysis, they realized that a safer, clearer workspace was just as critical as organization and efficiency. G&W Electric intentionally added “Safety” as the sixth “S” to ensure their improvements also reduced risks and created a healthier work environment.

Action Plan

  • Sort: Remove unnecessary tools and fixtures cluttering the space.
  • Set in Order: Install shadow boards and create clearly labeled storage locations for each fixture and tool. Separate fixtures used in PD testing from those needed for other workbench tasks.
  • Shine: Clean and refresh the workspace by replacing worn-out bins and bench mats for a safer, more efficient environment.
  • Standardize: Develop a comprehensive list that matches specific bushings to their corresponding fixtures. Update Training Within Industry (TWI) instructions and work procedures to reflect these standards.
  • Sustain: Introduce a daily 6S checklist for start- and end-of-shift checks to maintain the improvements in the long term.
  • Safety: Elevate to a deliberate focus as the sixth “S”. Integrate safety measures into workspace organization and daily routines, ensuring that visual controls and clear layouts not only improve productivity but also minimize hazards.

The Impact: A Smooth-Running Operation

The results were immediate.

A3 Report Results

  • Production Goals Achieved: The PD Bushing Testing team consistently hits the target of 135 units per shift.
  • Reduced Waste: Time wasted searching for tools has been virtually eliminated.
  • Improved Workflow: Clear organization and dedicated spaces for tools ensure smoother, faster processes.
  • Enhanced Safety and Morale: A clean, organized workspace contributes to a safer and more satisfying work environment.
  • Sustained Improvement: Daily 5S checks and standardized instructions ensure long-term adherence to best practices.

This case is a powerful example of the SHINGO principle that a truly “world-class” manufacturing environment is: “Self-ordering, self-explaining, self-regulating, and self-improving, where what is supposed to happen does happen, on time, every time, because of visual devices.“

A Lesson for Every Manufacturer

Bottlenecks like G&W Electric’s often hide in plain sight. They’re not always caused by expensive equipment failures or lack of effort—but by disorganization, unclear standards, and hidden waste. That’s why tools like 5S and A3 Thinking are so effective. They provide manufacturers with a practical, scientific approach to tackle real problems, implement solutions, and ensure lasting improvements.

If your facility is struggling with persistent challenges or simply wants to elevate its operational performance, consider how WCM and structured problem-solving can transform your operations from the inside out.

Interested in learning how MSI’s World Class Manufacturing program can help your team achieve similar results? Explore our WCM training and consulting solutions today!


Dr. Victor Gray is a certified Six Sigma Black Belt with over two decades of experience helping manufacturers implement practical process improvement strategies. Have questions or want to connect? Reach out on LinkedIn or email us at communications@msi-workforce.com. Be sure to subscribe to the MSI Workforce Perspectives LinkedIn Newsletter for more insights and updates!


Discover more from Manufacturing Skills Institute

Subscribe to get the latest posts sent to your email.

Tags

Discover more from Manufacturing Skills Institute

Subscribe now to keep reading and get access to the full archive.

Continue reading